I have been working on about everything you can imagine, from engine work to fuel and brake lines. The air conditioner is the main issue right now as the bracketry does not allow enough clearance to install the radiator. Old air products is sending me two new brackets on Wednesday to see if that helps, I may have to design my own idler pulley set up but we will have to see. I got the top loader four speed stuck in and the Hurst super competition shifter linked and adjusted. Too much to write about but if you go to YouTube and search andy67stang you can see more, and here are some pictures to look at. Andy
Monday, October 19, 2009
This that and the other.
I have been working on about everything you can imagine, from engine work to fuel and brake lines. The air conditioner is the main issue right now as the bracketry does not allow enough clearance to install the radiator. Old air products is sending me two new brackets on Wednesday to see if that helps, I may have to design my own idler pulley set up but we will have to see. I got the top loader four speed stuck in and the Hurst super competition shifter linked and adjusted. Too much to write about but if you go to YouTube and search andy67stang you can see more, and here are some pictures to look at. Andy
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment